Restored rival gathering at shared deposits
Rival engineers can begin working inside a deposit instead of demanding an occupied center point.
I changed the gathering arrival check so rival engineers can work inside a resource field, with a two-metre inset from its edge. They no longer have to crowd onto the exact center before harvesting.
This follows up the deposit congestion left in the twenty-hour experiment. The saved-world checks restored the three affected economies. The footage shows their native Armies accounts, while the capture records verify that each resumed harvesting; it does not claim a filmed worker animation.
“I changed the gathering arrival check so rival engineers can work inside a resource field, with a two-metre inset from its edge. They no longer have to crowd onto the exact center before harvesting.”
Construction keeps its existing two-metre work reach. The checkpoint experiment retains its protected-player and disabled-worm setup; it is not an ordinary campaign or a new uninterrupted twenty-hour run.